Scope
- Significant structural rectification and design verification undertaken due to previous builder going insolvent
- Complex site management with limited logistics and other sites in close proximity
- Design resolution of a complex build, directly opposite a marine environment, was critical for the client and the longevity of the building
- Superior finishes achieved with off-form concrete, acacia windows and polished terazzo floors